-40%

Mercedes Benz Electric Control Unit Ecu A 000 446 03 39 Bosch 0281001334

$ 66

Availability: 100 in stock
  • Type: Electric Control Unit
  • Condition: For parts or not working
  • Warranty: No Warranty
  • Country/Region of Manufacture: Germany
  • Brand: Mercedes-Benz

    Description

    Mercedes Benz Electric Control Unit Ecu A 000 446 03 39 Bosch  0281001334
    for details please look at the pictures.
    CONDITION
    :
    As shown in the pictures
    .
    As you can see in the photos the object was removed from a vehicle.
    There is no possibility of testing.Sold for Parts.
    Sold as it is, no warranty.
    What you see is what you get.
    The buyer is responsible for Customs regulations in their country.
    SHIPPING COSTS
    :
    FIND  YOUR COUNTRY'S CODE
    HERE
    AND CHECK  THE
    EXACT
    SHIPPING COST.
    ***********ALL BUYERS
    EXCEPT FOR THE USA,CANADA AND MEXICO
    ,
    SHOULD WAIT TO BE SENT  THE INVOICE WITH THE CORRECT SHIPPING COST**********
    ZONE 21,22,31
    :
    HR,HU,PL,SK,SI,CZ,
    BG,EE,LV,LT,MT,RO,CH,LI,NO
    .00
    ZONE 701:
    GB
    .00
    ZONE 1:
    BE,FR,DE,IT,CY,MC,NL.
    .00
    ZONE 2:
    PT,AT,DK,IE,ES,LU,SE,FI.
    .00
    ZONE 3:
    AL,AD,BA,GI,RS,RU,GG,JE,MD,ME,UA,SM,TR.
    .00
    ZONE 4:
    AZ,EG,ES,AM,PS,JE,GL,AE,JO,IQ,IS,IL,KZ,IC,QA,KG,KW,LB,BH,HN,UZ,ES,TJ,TM,YE,FO.
    .00
    ZONE 5:
    US,CA,MX.
    .00
    ZONE 6:
    AU,AF,VN,JP,IN,ID,KE,CN,LS,MY,MN,NZ,NG,ZA,KR,PK,SG,SZ,TW,TH,PH,HK,
    .00
    ZONE 7:
    AO,ET,HT,CI,DZ,AS,TL,AI,AG,AR,AW,VU,VE,BM,VG,BO,BR,GF,PF,FM,GM,GA,GH,GU,
    GP,WF,GT,GY,GN,GQ,GW,GD,SV,ER,ZM,VC,EC,KY,CM,KH,CF,KI,CO,CD,CG,CR,CK,CW,KM,LA,
    LR,LY,MG,MO,MW,MV,ML,MU,MP,MA,MH,MQ,MR,YT,MZ,MS,BD,BB,AG,BS,BZ,BJ,BQ,BW,BF,
    BI,BT,BN,NA,NC,KN,NP,NE,NI,HN,UG,UY,PW,PA,PG,PY,VI,PE,CV,RE,MP,RW,VC,BQ,KN,VI,SX,BL,
    WS,LC,SC,SR,LK,PF,TZ,TC,JM,DJ,TO,TG,VG,TV,TT,TD,TN,FJ,CL,YT.
    .00
    We ship almost everywhere and only to the address given by  E-bay
    We do combined shipping.
    PAYMENT
    ·  Payments should be made within 3 days.
    PACKAGE
    ·
    We select the most efficient way of packaging so that the items arrive safely.